Aaron Pickern for Mayor of Tampa

Issues

Research, not a locked platform

Open a topic. These notes will change as we sit in more rooms. I will not invent a mayor’s power the charter does not give.

Flooding, traffic, housing costs, and neighborhood basics are where most Tampa kitchens already live. They are a starting list, not a finished platform.

Flooding

When the sky dumps a hard rain, inland streets go under too. Hurricane Milton put water in 150 to 250 homes in Parkland Estates and Palma Ceia Pines for about 12 hours. The city’s 2025 vulnerability study names extreme rainfall as the near-term flood risk, not a seminar on slow sea-level rise.

The South Howard Flood Relief Project is a city stormwater job still in design: a long box culvert, a new outfall, and a price tag neighbors have heard as about $100 million in news coverage. City staff have said the design is sized for a little more than five inches of rain in eight hours. If your street drowns in a five-inch rain, a culvert still on paper is the argument.

This is not a South Tampa story only. S.E. Seminole Heights already has flood-relief construction in the ground. Forest Hills, Golf View, the Lower Peninsula, and Port Tampa have pumps, outfalls, and wastewater work too. The city has said it is putting tens of millions into upgrading wastewater pump stations after Helene and Milton flooded stations built in the 1950s and 1960s.

A mayor can move city stormwater design, city bonds, and the capital plan. THEA money, FDEP permits, FDOT drains, and county ditches are not a mayor’s switch. I will not promise someone else’s budget.

Sources: City of Tampa 2025 Vulnerability Assessment; FOX 13, 7 Apr 2025; WUSF, 3 Aug 2026; Bay News 9, 12 Aug 2026; city stormwater CIP.

Traffic

Tampa owns about 1,212 miles of city road. Neighbors logged 1,898 pothole calls in 2025. The city paved a record 76 lane-miles that year, against a long-run average near 40, and Mobility still said there is a long way to go. The paving budget has been moving up, including All for Transportation dollars the city spends on city streets.

The pothole in front of the house is a city street, not the interstate. I-275 and I-4 are FDOT. The Selmon is THEA. HART does not pave. A mayor who talks like they run the interstate is selling a job they do not have.

Kitchen-table traffic is also the light that never cycles, the school pickup that stacks, the crosswalk a person does not trust, and the bus that does not come. Crime numbers can fall and people still do not feel safe crossing the street. That mix is city police and city streets together, not a slogan.

A mayor can pave, stripe, time lights, fix city potholes, and set city safety work on city roads. They cannot reroute I-4 or spend the county’s surtax as if it were City Hall cash.

Sources: City of Tampa paving report, June 2026; city news, 20 Apr 2026; FOX 13 paving briefing, 20 Apr 2026; TPD 2025 annual report.

Housing costs

The City of Tampa’s Comprehensive Housing Needs Assessment (November 2025) finds more than 26,000 affordable-and-available homes missing for renter households at or below 50% of area median income. That is the city’s own hole, not a consultant’s vibe.

The same assessment, as reported in named coverage, says home values rose about 58% since 2020 and rents nearly 50%. More than half of Tampa renter households already spend too much of the paycheck on the roof. Teachers, firefighters, and service workers are competing for homes that are not there.

In May 2026 the city said more than 8,300 affordable units were completed or underway since 2019, after more than $100 million in city housing spending, and that the 10,000-unit goal will not be hit by the end of this term. Pipeline units are not keys in the door. Finished units are.

A mayor can touch zoning, permitting, ADUs, rehab, and the housing budget. Live Local already upzones some commercial and industrial land without Council. Wages, interest rates, and investor purchases are not a mayor’s switch. I will not promise to close a 26,000-home gap with the General Fund.

Sources: City of Tampa Comprehensive Housing Needs Assessment, Nov 2025; Bay News 9, 2 Oct 2025 and 27 May 2026; city news, 27 May 2026; AARP Florida, 9 Oct 2025.

Neighborhood basics

Lights that work. Grass cut in the median. A sidewalk a stroller can use. Trash on time. A park you would let a child play in. Code that answers the phone. Stormwater fees and water bills that neighbors can actually read. These are the unglamorous jobs that tell you whether City Hall sees your block.

Every neighborhood means East Tampa, West Tampa, New Tampa, Sulphur Springs, Seminole Heights, the Lower Peninsula, and Port Tampa, not only the rooms that already have a microphone. North of Fowler is still the City of Tampa. A calendar that only visits SoHo and downtown is not a citywide race.

The tax bill, the stormwater line, and the water bill are three city charges on one kitchen table. City millage for FY2026 is 6.2076 mills. Stormwater is a city assessment. Water and wastewater rates step on a published schedule. Roughly 60% of Tampa’s gravity sewer pipes are more than 60 years old, city staff have said. The pipes under the street are older than a lot of the people paying for them.

A mayor prepares the budget. Council adopts millage and rates. The county appraiser sets taxable value. School millage is the school board. I will not mix those bills into one “Tampa raised your taxes” line, and I will not promise a millage cut I have not run.

Sources: FY2026 millage, Resolution 2025-813; city stormwater assessment FAQ; city PIPES rate schedule; Florida Politics budget workshop coverage, 2026.

If your street fight is not on this list yet, tell us the neighborhood. That is how the list grows.